Challenge 12: Predicting Voltages in Substations
For grid stabilization, operators of different voltage levels have target voltage schedules. These support grid stabilization. It is possible to influence the voltage in a substation with shunt reactors via reactive power compensation. Turning these shunt reactors on or off causes transients, which in turn cause wear and tear on the components of the substation and the shunt reactor. This means a grid operator wants to minimize the number of on/off switches of the shunt reactor while still using it to keep the voltage in the substation as close as possible to the target voltage published by the higher voltage level grid operator. We have time series measurements and target voltages for several of our substations with shunt reactors and aim to train a model that can tell us when to turn the shunt reactors on or off.
Challenge Owner: Axpo Grid AG Nicolas Pelzmann Tobias Schmocker Sandro Renggli
Energy Data Hackdays 2023